Project Desciption

Perigon provided complete Balance-of-Plant system design including construction documents and construction support for the installation of twin 15 MW Gas Turbines with 13.8kV synchronous generators and supporting systems.  The facility generators connect to the electrical distribution grid to provide peak demand power generation.  The BOP design included complete underground conduit bank distribution (3D modeled), underground piping, steel, foundations, site (stormwater & erosion control), interconnection wiring, area lighting, cathodic protection, lightning protection, and ground grid.

We take our name from the geometric angle of 360 degrees representing the full circle of engineering services we provide.