Projects
Energy Management 48MW BioMass Waste to Energy



New Biodiesel Production Facility
Arkansas


Perigon provided selected Process, Instrumentation, and Mechanical engineering and design services for a new 40MM gallon per year Biodiesel Plant which was scheduled for start-up and commissioning in September of 2007. Other Perigon services included:


  • Preparation of equipment, and tank specifications for Methanol, Catalyst, and Biodiesel Product Storage Tanks and pump sizing
  • Instrument Selection and Specification
  • P&ID and PFD Development
  • General Layouts
  • Input to Detailed Installation and Commissioning Plan
  • Electrical Code Review on non-US-made Equipment